Job: splitter instead of blasting
There is a old underground water pipe need to reconstruct, it's near by Stockholm royal showplace. They have to dig one wide 4 meters and deep 2 meters entrenchment, during reconstruction, they confront 40 meters rock, about 110 cube. Using traditional way can't continue work, they must break up the 40 meters rock.
Due to below reasons:
1. Maybe destroy neighboring underground metro station
2. There is a nearby antique furniture store, if using blating way, it will take 3 workers and 10 days to move antique furnitures
3. Taking some measures to protect surrounding buildings, and traffic control
All these will spend much time and cost.
We offer a economic and quick resolvent, using two hydraulic splitter with diesel power pack and offer 820T splitting force to settle problem.